Project Description

This project replaces storm drainage on McGregor Boulevard from Colonial Boulevard to Poinciana Avenue. In addition to replacing the existing pipes, the project will resurface the roadway, replace sidewalk where needed, update crosswalks with new striping and ADA accommodations and replace some signage.  The final product will not change the design of McGregor Boulevard as it is today.  The project is anticipated to be completed in fall 2018.

 

The contractor will need to install storm drainage pipes, some up to 30 inches in diameter and five to six feet deep, in multiple locations across McGregor Boulevard.  Lane closures and flagging operations will be required on McGregor Boulevard during these pipe crossings.  The contractor will also need to cross some side streets with storm drainage pipe which will require residents to use alternate routes to reach their properties.  When crossing dead-end side streets, the contractor will maintain one lane for access.  Flaggers will be on-hand to assist residents.

McGregor Boulevard

Roadway and Drainage Improvements Project

City of Fort Myers | McGregor Boulevard Roadway and Drainage Improvements Project

McGregor Boulevard

Roadway and Drainage Improvements Project