McGregor Boulevard

Roadway and Drainage Improvements Project

Project Description

This project replaced storm drainage on McGregor Boulevard from Colonial Boulevard to Poinciana Avenue. In addition to replacing the existing pipes, the project resurfaced the roadway, replaced sidewalk where needed, updated crosswalks with new striping and ADA accommodations and replaced some signage. The final product did not change the design of McGregor Boulevard. The project completed in April 2018.

 

During construction, the contractor installed storm drainage pipes, some up to 30 inches in diameter and five to six feet deep, in multiple locations across McGregor Boulevard. Lane closures and flagging operations were required on McGregor Boulevard during these pipe crossings. The contractor also crossed some side streets with storm drainage pipe which required residents to use alternate routes to reach their properties. When crossing dead-end side streets, the contractor maintained one lane for access. Flaggers were on-hand to assist residents.

City of Fort Myers | McGregor Boulevard Roadway and Drainage Improvements Project

McGregor Boulevard

Roadway and Drainage Improvements Project